Ocean Thermal Energy Conversion (OTEC)
  by L. A. Vega, Ph.D., Hawaii, USA.

Previous: OTEC and the Environment

Engineering Challenges

The design and installation of a cost-effective pipe to transport large quantities of cold water to the surface (i.e., cold water pipe, CWP) presented an engineering challenge of significant magnitude complicated by a lack of evolutionary experience. This challenge was meet in the USA with a program relying on computer-aided analytical studies integrated with laboratory and at-sea tests. The greatest outcome achieved has been the design, fabrication, transportation, deployment and test at-sea of an instrumented 2.4 m diameter, 120 m long, fiberglass reinforced plastic (FRP) sandwich construction pipe attached to a barge. The data obtained was used to validate the design technology developed for pipes suspended from floating OTEC plants. This type of pipe is recommended for floating OTEC plants. For land-based plants there is a validated design for high-density polyethylene pipes of diameter less than 1.6 m. In the case of larger diameter pipes offshore techniques used to deploy large segmented pipes made of steel, concrete or FRP are applicable. Pressurized pipes made of reinforced elastomeric fabrics (e.g., soft pipes), with pumps located at the cold water intake, seem to offer the most innovative alternative to conventional concepts. However, the operability of pumps in 800 m to 1000 m water depths over extended periods must be verified and the inspection, maintenance and repair (IM&R) constraints established before soft pipes can be used in practical designs.

Other components for OTEC floating plants that present engineering challenges are the position keeping system and the attachment of the submarine power cable to the floating plant. Deep ocean-mooring systems, designed for water depths of more than 1000 m, or dynamic positioning thrusters developed by the offshore industry can be used for position keeping. The warm water intake and the mixed return water also provide the momentum necessary to position the surface vessel. The offshore industry also provides the engineering and technological backgrounds required to design and install the riser for the submarine power cable.

The design of OTEC CWPs, mooring systems and the submarine power cable must take into consideration survivability loads as well as fatigue induced loads. The first kind is based on extreme environmental phenomena, with a relatively long return period, that might result in ultimate strength failure while the second kind might result in fatigue-induced failure through normal operations.

Next: Open Cycle OTEC 

© 1999. L. A. Vega. All rights reserved.
Published here with the kind permission of the author.